From the first stone, till the last plant
From Excavations and earthworks, construction of the subsurface rainwater collector and the water storage tanks, pipelines, stone works (rubble wall and harmonization with landscape architecture), field preparation, drip irrigation network and plantation of oregano crop, until the final HYDRO3 prototype system installed and running (operational face – rainwater collection). All these, in a time lapse construction video. Just to get a small “bite” of how this innovative system was made!